: 2657 days (11.10.2018)

:


The finishing construction works on a new residential building in Burgas is underway. The construction project is located on a plot of 250 sq. m and has been planned with ground level, five floors and an attic level. The ground level is set with garages and outdoor parking spaces.

-

:
: 01 , 23 19.01.2026

:
: 01 , 32 19.01.2026

:
: 3 days 16.01.2026

72

5  ,